Skip to product information
1 of 10

Tatifurs

Mongolian Blanket Throw Dark Brown Cream Beige Two Tone

Mongolian Blanket Throw Dark Brown Cream Beige Two Tone

Regular price $333.00 USD
Regular price $665.00 USD Sale price $333.00 USD
Sale Sold out
🔥 people have this in their cart right now
🌍 100% Free Worldwide Shipping • 3–5 Business Days
Dimensions
Quantity

Mongolian blanket throw dark brown cream beige two tone — one blanket, two colours: dark brown down one side, cream beige down the other, in full skin Mongolian lamb.

Dark brown and cream beige are both natural Mongolian lamb shades, so this is the pairing that looks least like a design and most like something nature made: espresso depths beside milky cream, like coffee and foam. It is the quietest two-tone in the collection and the easiest to live with. The mongolian blanket throw dark brown cream beige two tone puts that colour on the largest surface in the room: a full skin Mongolian sheepskin throw with wool up to 10 cm long, draped over a sofa, a bed or the floor by the fire.

The mongolian blanket throw dark brown cream beige two tone is built as two full-length colour fields, split straight down the middle of the blanket, one colour on each side. Each half is made from whole skins in its own colour, matched for curl length so the seam between dark brown and cream beige disappears into the wool and the two fields read as one piece. Flip it, fold it or drape it and you get a different balance of the two colours every time. Velvet cotton backing, handcrafted in Greece by TatiFurs artisans since 1972, eight sizes with custom sizes on request.

100% RISK FREE — 14-day money-back guarantee.
Pair it with our fur slippers, see the rest of the sheepskin throw blankets and the full real fur blanket collection, or read about the family atelier on our about page.

🏆 WHERE IT BELONGS
● A warm neutral living room: two natural tones that already exist in the room, wood and linen, brought together in one piece
● A cabin, farmhouse or chalet: the honest colours of the material, by the fire, where they belong
● A bedroom in oatmeal and ivory: the cream half blends into the bedding, the brown half frames it
● A gift that needs no sizing: Every mongolian blanket throw dark brown cream beige two tone ships in luxury packaging with a certificate of authenticity — the housewarming, wedding or anniversary gift that people keep for decades

✨ SPECIFICATIONS
● Material: 100% Genuine Mongolian (Tibetan) Lamb Sheepskin — Full Skins
● Colors: Espresso brown and cream beige — split lengthwise, half and half
● Design: Two tone — one straight colour change along the length of the blanket
● Wool length: Long — naturally curled Mongolian wool, up to 10 cm
● Construction: Full skin — every skin preserved intact, never pieced
● Backing: Premium velvet cotton
● Sizes: 8 sizes from 100x100 cm to King 230x270 cm — custom sizing on request
● Handcrafted in Greece
● Free worldwide shipping | Express options available

🛡️ YOUR CONCERNS, ANSWERED
● Don't love it? ✅ 14-day free returns, 100% money back
● Need it fast? ✅ Express shipping available
● Will it shed? ✅ Professionally finished — zero shedding
● Worried about colour? ✅ Live photos of your blanket sent before shipping
● Price too high? ✅ Split into 3 payments with Klarna
● Questions? ✅ 24/7 customer support, always here

🌟 WHY TATIFURS
A two-tone blanket lives or dies at the seam. The two colours must meet in a straight line with the long curls flowing across it, not a ridge, not a gap, and the skins on each side must match each other as closely as any single-colour blanket we make. That is two colour-matching jobs and one invisible join, which is why we build these only from whole skins and only by hand. The result is a mongolian blanket throw dark brown cream beige two tone that looks designed rather than assembled. Over fifty years of Greek fur craftsmanship go into every piece, and the mongolian blanket throw dark brown cream beige two tone is one of the most demanding things that craft produces.

🧵 CARE
- Professional sheepskin cleaning only
- Store in a cool, dry, dark place
- Avoid moisture, direct sunlight and detergents
- Do not compress for long periods — let the long wool breathe and recover its curl
- Shake gently and air to restore full volume after use

📦 WHAT'S INCLUDED
● 1x Mongolian Blanket Throw Dark Brown Cream Beige Two Tone
● Certificate of Authenticity
● Care Instructions Card
● Luxury gift packaging

Dark Brown. Cream Beige. One blanket, two moods. Mongolian blanket throw dark brown cream beige two tone.

Materials

100% Real Fur

Shipping & Returns

● Free Shipping worldwide 5-10 business days
● Express shipping options available
● 14 days free exchanges and returns

Fear Guide

● Don’t like it? ✅ 100% risk free within 14 days. Free returns with 100% money back guarantee
● Sizing concerns? ✅ Specify your desired dimensions for a custom fit
● Need it fast? ✅ Affordable express shipping available
● Shedding? ✅ Professionally cleaned, no shedding issues
● Color accuracy? ✅ Request a live photo before shipping to confirm your exact blanket
● High price? ✅ Use Klarna to split payment into 3 months
● Customer support? ✅ We’re here for you 24/7

Care Instructions

- Professional fur cleaning recommended
- Shake gently to fluff and restore volume
- Store in a cool, dry place away from sunlight and moisture
- Never use detergents or stain removers

View full details
  • Free Shipping

    Free Worldwide Shipping. We also provide express shipping options.

  • 14 Days Returns

    You have 14 days to return your products and get a full refund!