Skip to product information
1 of 10

Tatifurs

Mongolian Blanket Throw Light Brown — Wool Sheepskin Full Skin

Mongolian Blanket Throw Light Brown — Wool Sheepskin Full Skin

Regular price $333.00 USD
Regular price $665.00 USD Sale price $333.00 USD
Sale Sold out
🔥 people have this in their cart right now
🌍 100% Free Worldwide Shipping • 3–5 Business Days
Dimensions
Quantity

Mongolian blanket throw light brown — full skin Mongolian lamb, the longest wool we work with, in a colour that is gentle and earthy.

Light brown is the softest of the natural tones: a milky caramel with blonde highlights along the tips of the curls and a mushroom-brown depth underneath. It is warmer than grey, calmer than camel and sits perfectly in the neutral palettes most homes are built on. The mongolian blanket throw light brown puts that colour on the largest surface in the room: a full skin Mongolian sheepskin throw with wool up to 10 cm long, draped over a sofa, a bed or the floor by the fire.

Every mongolian blanket throw light brown is made from whole Mongolian lamb skins, never pieced scraps, so the long curly wool flows uninterrupted from edge to edge. The milky caramel light brown is dyed into the fibre and graded skin by skin under daylight, because long wool shows every shift in tone; a skin that reads even slightly off against its neighbours is set aside. A velvet cotton backing finishes the reverse. Handcrafted in Greece by TatiFurs artisans continuing a family legacy since 1972, in eight sizes from a 100x100 cm lap throw to a king-size bedspread, with custom sizes on request.

100% RISK FREE — 14-day money-back guarantee.
Pair it with our fur slippers, see the rest of the sheepskin throw blankets and the full real fur blanket collection, or read about the family atelier on our about page.

🏆 WHERE IT BELONGS
● A beige and greige living room: light brown long wool adds the texture that flat neutral rooms are missing, without introducing a new colour
● A sofa in natural linen or boucle: caramel curls on oatmeal fabric is a soft, tonal, tactile combination that photographs beautifully
● A bedroom with warm wood furniture: it picks up the oak and walnut tones in the room and ties the whole scheme together
● A gift that needs no sizing: Every mongolian blanket throw light brown ships in luxury packaging with a certificate of authenticity — the housewarming, wedding or anniversary gift that people keep for decades

✨ SPECIFICATIONS
● Material: 100% Genuine Mongolian (Tibetan) Lamb Sheepskin — Full Skins
● Color: Milky caramel light brown — consistent tone from the tips to the depths of the curl
● Wool length: Long — naturally curled Mongolian wool, up to 10 cm
● Construction: Full skin — every skin preserved intact, never pieced
● Backing: Premium velvet cotton
● Sizes: 8 sizes from 100x100 cm to King 230x270 cm — custom sizing on request
● Handcrafted in Greece
● Free worldwide shipping | Express options available

🛡️ YOUR CONCERNS, ANSWERED
● Don't love it? ✅ 14-day free returns, 100% money back
● Need it fast? ✅ Express shipping available
● Will it shed? ✅ Professionally finished — zero shedding
● Worried about colour? ✅ Live photos of your blanket sent before shipping
● Price too high? ✅ Split into 3 payments with Klarna
● Questions? ✅ 24/7 customer support, always here

🌟 WHY TATIFURS
Long Mongolian wool in light brown is harder to get right than it looks. Dye takes differently on every skin, and at this wool length the colour is seen three times over: on the lit tips, in the mid-curl and in the shadowed depths. A blanket where those three readings disagree from skin to skin looks patchy within a week of use. Our artisans match the skins for tone and curl before cutting, so the milky caramel light brown stays even across the whole surface and keeps its depth for years. Over fifty years of Greek fur craftsmanship go into every piece, and the mongolian blanket throw light brown is one of the most demanding things that craft produces.

🧵 CARE
- Professional sheepskin cleaning only
- Store in a cool, dry, dark place
- Avoid moisture, direct sunlight and detergents
- Do not compress for long periods — let the long wool breathe and recover its curl
- Shake gently and air to restore full volume after use

📦 WHAT'S INCLUDED
● 1x Mongolian Blanket Throw Light Brown — Wool Sheepskin Full Skin
● Certificate of Authenticity
● Care Instructions Card
● Luxury gift packaging

Soft. Natural. Easy to live with. Mongolian blanket throw light brown.

Materials

100% Real Fur

Shipping & Returns

● Free Shipping worldwide 5-10 business days
● Express shipping options available
● 14 days free exchanges and returns

Fear Guide

● Don’t like it? ✅ 100% risk free within 14 days. Free returns with 100% money back guarantee
● Sizing concerns? ✅ Specify your desired dimensions for a custom fit
● Need it fast? ✅ Affordable express shipping available
● Shedding? ✅ Professionally cleaned, no shedding issues
● Color accuracy? ✅ Request a live photo before shipping to confirm your exact blanket
● High price? ✅ Use Klarna to split payment into 3 months
● Customer support? ✅ We’re here for you 24/7

Care Instructions

- Professional fur cleaning recommended
- Shake gently to fluff and restore volume
- Store in a cool, dry place away from sunlight and moisture
- Never use detergents or stain removers

View full details
  • Free Shipping

    Free Worldwide Shipping. We also provide express shipping options.

  • 14 Days Returns

    You have 14 days to return your products and get a full refund!