Skip to product information
1 of 10

Tatifurs

Mongolian Blanket Throw Pink White Striped — Wool Sheepskin

Mongolian Blanket Throw Pink White Striped — Wool Sheepskin

Regular price $333.00 USD
Regular price $665.00 USD Sale price $333.00 USD
Sale Sold out
🔥 people have this in their cart right now
🌍 100% Free Worldwide Shipping • 3–5 Business Days
Dimensions
Quantity

Mongolian blanket throw pink white striped — wide bands of pink and white Mongolian lamb, alternating the full length of the blanket.

Pink and white together are softer than either colour alone: a powder-pink blush beside pure optic white, like the inside of a shell. In long curly wool the boundary between the two melts, and the whole blanket looks like a cloud at sunrise. The mongolian blanket throw pink white striped puts that colour on the largest surface in the room: a full skin Mongolian sheepskin throw with wool up to 10 cm long, draped over a sofa, a bed or the floor by the fire.

The mongolian blanket throw pink white striped is built as five wide bands of long wool, about 30 cm each, alternating from one end of the blanket to the other. Each band is made from whole skins in a single colour, and the bands are joined so the long curls of one colour spill into the next; the stripes stay crisp from a distance and soften into each other up close. Velvet cotton backing, handcrafted in Greece by TatiFurs artisans since 1972, eight sizes with custom sizes on request.

100% RISK FREE — 14-day money-back guarantee.
Pair it with our fur slippers, see the rest of the sheepskin throw blankets and the full real fur blanket collection, or read about the family atelier on our about page.

🏆 WHERE IT BELONGS
● A girl's bedroom: the blanket every girl asks for, made from real Mongolian lamb instead of polyester
● A white and blush living room: the two colours the room is already built on, in one luxurious piece
● A nursery or a new mother's gift: the softest, most beautiful thing to wrap around a new life
● A gift that needs no sizing: Every mongolian blanket throw pink white striped ships in luxury packaging with a certificate of authenticity — the housewarming, wedding or anniversary gift that people keep for decades

✨ SPECIFICATIONS
● Material: 100% Genuine Mongolian (Tibetan) Lamb Sheepskin — Full Skins
● Colors: Powder pink and pure white — alternating wide bands
● Design: Striped — five bands about 30 cm wide across the length of the blanket
● Wool length: Long — naturally curled Mongolian wool, up to 10 cm
● Construction: Full skin — every skin preserved intact, never pieced
● Backing: Premium velvet cotton
● Sizes: 8 sizes from 100x100 cm to King 230x270 cm — custom sizing on request
● Handcrafted in Greece
● Free worldwide shipping | Express options available

🛡️ YOUR CONCERNS, ANSWERED
● Don't love it? ✅ 14-day free returns, 100% money back
● Need it fast? ✅ Express shipping available
● Will it shed? ✅ Professionally finished — zero shedding
● Worried about colour? ✅ Live photos of your blanket sent before shipping
● Price too high? ✅ Split into 3 payments with Klarna
● Questions? ✅ 24/7 customer support, always here

🌟 WHY TATIFURS
Stripes in long wool are the hardest design we make. Every band edge is a seam, every seam must run straight across the full width, and every band must be the same width as the one before it, or the whole blanket looks crooked. The skins inside each band are matched exactly as they would be in a single-colour piece. Four extra seams, two colour matches, one straight edge after another: it takes our artisans roughly twice as long as a plain pink blanket, and it shows. Over fifty years of Greek fur craftsmanship go into every piece, and the mongolian blanket throw pink white striped is one of the most demanding things that craft produces.

🧵 CARE
- Professional sheepskin cleaning only
- Store in a cool, dry, dark place
- Avoid moisture, direct sunlight and detergents
- Do not compress for long periods — let the long wool breathe and recover its curl
- Shake gently and air to restore full volume after use

📦 WHAT'S INCLUDED
● 1x Mongolian Blanket Throw Pink White Striped — Wool Sheepskin
● Certificate of Authenticity
● Care Instructions Card
● Luxury gift packaging

Pink and White, band after band. The blanket with a rhythm. Mongolian blanket throw pink white striped.

Materials

100% Real Fur

Shipping & Returns

● Free Shipping worldwide 5-10 business days
● Express shipping options available
● 14 days free exchanges and returns

Fear Guide

● Don’t like it? ✅ 100% risk free within 14 days. Free returns with 100% money back guarantee
● Sizing concerns? ✅ Specify your desired dimensions for a custom fit
● Need it fast? ✅ Affordable express shipping available
● Shedding? ✅ Professionally cleaned, no shedding issues
● Color accuracy? ✅ Request a live photo before shipping to confirm your exact blanket
● High price? ✅ Use Klarna to split payment into 3 months
● Customer support? ✅ We’re here for you 24/7

Care Instructions

- Professional fur cleaning recommended
- Shake gently to fluff and restore volume
- Store in a cool, dry place away from sunlight and moisture
- Never use detergents or stain removers

View full details
  • Free Shipping

    Free Worldwide Shipping. We also provide express shipping options.

  • 14 Days Returns

    You have 14 days to return your products and get a full refund!